Subsystem version
Developer | Document Owner | Version | Release date | Update | Status |
---|---|---|---|---|---|
2020.2 |
| DONE |
Subsystem Description
Type | Description |
---|---|
CPU type (Low-Level demon) | Windows Virtual Machine |
Communication lines | BTF1 Moxa Line : 192.168.190.29 - (port 1) |
BTF1 | TB01 Vertical (2 Axis), TB02 Horizontal (2 Axis), TB03 Vertical (2 Axis), TB04 Horizontal (2 Axis), TB05 Horizontal ((2 Axis), TGT001 (1 Axis) |
BTF2 | TB06 Horizontal (2 Axis), TGT002 (1 Axis) |
(characterization 20-21 April 2021)
Line's characteristic | PID | Enc. Rel. | Encoder Pot. | Note | |||||
Scraper Name | Axis | R[ohm] | L[mH] | Kp | Ki | Corsa [mm] | Out [V] | In [V] | |
SLT TB 005 L | 20 | 0.91 | 3.35 | 4.36 | 0.47 | 39.04 | 6.33 | 2.36 | (1) |
SLT TB 005 R | 21 | 0.98 | 3.45 | 4.40 | 0.47 | 39.51 | 6.33 | 2.36 | (1) |
SLT TB 006 L | 25 | 1.02 | 4.41 | 4.31 | 0.47 | 40.00 | 6.61 | 2.52 | (2) |
SLT TB 006 R | 24 | 1.00 | 3.37 | 4.27 | 0.46 | 39.23 | 6.37 | 2.34 | (2) |
TGT TB 002 | 22 | 0.91 | 3.22 | 4.17 | 0.45 | 99.57 | 7.39 | 1.13 | (2) |
(1) BTF Line 1
(2) BTF Line 2
Programming languages
Language | Required Add ons/Plugings/Extensions/Libraries |
---|---|
LabVIEW 2010 (64-bit) - Windows | TML Lib (Technosoft Motion Library) |
Hardware layout
BTF line 1 scraper value
Scraper | TB4-R | TB4-L | TB2-R | TB2-L | TB3-U | TB3-D | TB01-U | TB01-D | TGTTB001 | TB5-L | TB5-R |
---|---|---|---|---|---|---|---|---|---|---|---|
Asse | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 20 | 21 |
Molt | 20 | 20 | 20 | 20 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
mm giro | 1,5 | 1,5 | 1,5 | 1,5 | 1 | 1 | 1 | 1 | 1 | 1,5 | 1,5 |
Linee Encoder | 800 | 800 | 800 | 800 | 1600 | 1600 | 1600 | 1600 | 1600 | 16384 | 16384 |
Range | 28,3 | 23,8 | 26,25 | 28,05 | 26,1 | 26,25 | 25,3 | 24,1 | 150 | 39,04 | 39,52 |
Max Speed | 200 | 200 | 200 | 200 | 100 | 100 | 50 | 50 | 100 | 100 | 100 |
BTF line 2 scraper value
Scraper | TGTTB002 | TB6-R | TB6-L |
---|---|---|---|
Asse | 22 | 24 | 25 |
Molt | 1 | 1 | 1 |
mm giro | 1,5 | 1,5 | 1,5 |
Linee Encoder | 16384 | 16384 | 16384 |
Range | 99,57 | 39,23 | 40 |
Max Speed | 100 | 100 | 100 |
Hardware Front-end
The motors are controlled by drives called "MOTION SYSTEM INTERFACE DEVICE" assembled by "RAMTRON Computing".
The box is equipped with two Technosoft drives IDM240-5EI or IDM640-8EI , to operate 2 Stepper Motors.
Motor description
Old series: SloSyn motor with incremental differential Encoder (400 steps/round)
New series: MAE motor with incremental differential Encoder HEDS 5645 (200 steps/round)
Fig. SloSyn Motor connections
Mechanical description
"Encoder" view
CW | CCW |
---|---|
Scraper IN | Scraper OUT |
"Bolt" view
CW | CCW |
---|---|
Scraper OUT | Scraper IN |
ATTENTION! Some Scrapers have a mechanical gearbox (20:1.5); every 20 turns of the axis the Scraper moves by 1.5 mm and
some Scrapers have a mechanical gearbox (1:1).
Operations on Scrapers assembly with RAMTRON drive
For relative movements, the positive steps (by Technosoft Software, Manual-Controller Labview, or Low-Level Devil) the Scraper must enter the chamber.
Relative movement: positive Steps → Scraper IN
Cabling diagram of the Scrapers subsystem
Cabling of new line BTF Scraper system (May 2018) for one axis only.
Drivers Configuration
STEP 1:
Connect the designed scraper to the computer
STEP 2:
Select the axis number
(control if the axis number is correct by checking the bottom right corner "AxisID")
STEP 3:
Create a new project by going: New> Close Frame Drive > IDM240-5EI CAN> 2 Phase stepper> Open Loop> Load sensor - None or Incremental
and for last select Setup
STEP 4:
Configure the uSwitch like in the image
STEP 5:
From the set up window start the Test Phase Connection
After the test is ended start the Identify Resistance and Inductance then save the new values
STEP 6:
Click drive setup to change window
start Power supply detect and set start current
after start the Tune and test
If the test fail, will be needed to adjust the response value till the test reach a positive result ( our configuration is works the best with a 1800 response value)
STEP 7:
Once all the test and configuration is ended click the button on top of the app to export the configuration
after a quick load press the red "X" next to the export button and save the project